Project Overview

The Yangjiang Fanshi I Offshore Wind Farm, developed by China General Nuclear Power Group (CGN), is a key part of China’s push toward renewable energy and carbon neutrality. Located in the South China Sea, off the coast of Guangdong Province, the wind farm has a planned capacity of over 400 MW, generating clean electricity for hundreds of thousands of households annually. Operating in a marine environment presents unique challenges, requiring reliable, durable, and corrosion-resistant electrical systems to ensure long-term performance and safety.

QiFan’s Role

Shanghai QiFan Cable Co., Ltd. was selected as a trusted supplier of submarine power cables for the project. Our responsibility was to provide customized cable solutions that could withstand harsh offshore conditions and deliver consistent performance over the project’s expected 25+ year lifespan.

Key Products Supplied:

66KV Submarine Cables for inter-array and export connections
Steel Wire Armored Offshore Cables for enhanced mechanical protection

Project Implementation & Achievements​

Customized R&D & Testing​
Before supply, QiFan conducted targeted R&D based on the project’s marine environment parameters (water depth, temperature, salinity) and collaborated with third-party testing institutions to perform 10+ strict tests.All products passed the tests with performance exceeding national standards (GB/T 13849.1-2022) and international IEC standards.​
Efficient Delivery & Installation Support​
On-Time Supply: Leveraging QiFan’s intelligent manufacturing base,we completed the production and delivery of 60 millions dollars cables within 3 months, ensuring the project’s construction schedule.​
Technical Service: Sent a professional technical team to the site to provide guidance on cable laying, joint installation, and insulation testing, solving on-site problems in real time and ensuring a 100% one-time installation success rate.​
Project Outcomes​
The project was officially completed and put into operation in 2024. As of the latest operation data:QiFan’s submarine cables have maintained stable operation with zero faults, ensuring the wind farm’s annual power generation target is met.​
CGN highly recognized QiFan’s product quality and service, and the two parties have established a long-term cooperative relationship for subsequent offshore wind projects.​

QiFan’s Commitment to Renewable Energy​

The successful implementation of our cable systems has contributed to the stable operation and electrical safety of Shanghai Stadium, supporting its continued use as a world-class venue for major events. This project further strengthens Qifan Cable’s reputation as a reliable partner for large-scale infrastructure projects.